• PLANT-STRUCTURAL DESIGN
    • Modular Portable Pug Mill
    • Reaction Tanks Access
    • Picking Station
    • Agitator Tower
    • Primary Crusher Module
    • Solomon Primary School
    • Pump PU41 Access
    • Pump PU20/58 Access
    • Guarding for Vibrating Screens
    • Valves Access Platforms
    • Valves Access Stairs
  • MATERIALS HANDLING
    • Silver Charging Conveyor
    • Silver Vacuum Unit
    • Destacking Trolleys
    • Stillage Conveing System
    • Slag Conveyor
    • Thevenard Hopper Screen
    • Supper Hopper
  • PIPING-DUCTING
    • Electrolite Tank Flues
    • Gas Extraction
    • Charge Port Venting
    • Colling Tower Piping
  • SPECIALISED EQUIPMENT
    • Gas Train Isolation
    • Horizontal Damper for Sinter Machine
  • INFRASTRUCTURE
    • Warf Unloading Facility


Bartco Design P/L,

  • Home
  • Services
  • Contact Us

Infrastructure



Development Aplication for main Wharf Port Lincoln

A 3D model and a series of 3D and 2D drawings of main Wharf Port Lincoln was developed as a part of DA for upgrade of main wharf infrastructure to enable existing port to be used for export iron ore from Centrex Metals Wilgerup mine.

The upgrade included; upgrading existing Rail Unloading Shed No2 and Storage Shed No.5, concept design for 3 new ICS conveyors, 2 standard belt conveyors, 2 new transfer towers and number of other equipment such us Dust Control Systems or trippers. The job was completed for SKM in April 2009.




Port Lincoln Wharf Model - Autodesk Inventor.






Rail Unloading Shead No.2 with new
Inloading ICS Conveyor.




Storage Shead No.5 with Transfer Tower, New Outloading
and Inloading ICS Conveyors.




Layout of the proposed Port Lincoln Wharf.

Bartco Design Pty Ltd

Ph. 08 8289 7752
Fax.08 8289 7852